Home
Investment
Services
Products
Projects
Investment homepage Invest in VEPOWER Limited Project opportunities
         
 
 
Your are here: VEPOWER.com / Investment / Invest in VEPOWER projects
VEPOWER invest in VEPOWER projects

VEPOWER has three projects currently open for investment:

  1. Project Essex:

    Project Essex is VEPOWER's power plant project to be developed in the East of England. It is VEPOWER’s latest bioenergy power plant.  It is being developed as a smaller capacity plant (~1.7MWe) to act as a showroom example of the Company’s proprietary fuel and heat management technologies.

    1.7MW is enough energy to make 56,610 mugs of tea every hour, every day, all year.

    The plant will comprise three 560kWe diesel generators running on the Company’s third generation biofuel.  Heat derived from the generator exhausts and parasitic electrical power will be used to provide energy for the fuel production process.    The designs look to promise ultra high efficiencies in excess of 60%, a super low carbon footprint for the energy supplied and a minimal visual impact on the site (secreted in a typical industrial unit on a business park in Essex).

    CO2 footprint

    The plant will utilise a combination of the latest proven technologies to reduce energy wastage. A normal diesel engine wastes >50% of the energy from the fuel as heat radiated from the cooling and lubrication or engine block and as heat in the exhaust gases. VEPOWER is employing a combination of solutions to reduce this waste to an absolute minimum.

    Run of the mill power stations burn copious amounts of fossil fuels (mainly gas and coal in the UK) to generate electricity. VEPOWER’s plants will consume recovered organic waste carefully blended with small amounts of specially cultivated sustainable energy crops (a ‘third generation bio-fuel’, not biodiesel). Since the plants which yielded this fuel were consuming carbon dioxide (CO2) from the atmosphere mere months previous, the plants will not emit gases that may contribute to global warming.

    Personal investments: private.finance@vepower.com
    Corporate investors: corporate.finance@vepower.com

  2. Biofuel plantation, Ghana:

    In partnership with a Ghanaian company VEPOWER is raising funds to develop a 50,000 hectare plantation.

    The plantation in Ghana will yield as much as 1400 kg of crude Jatropha oil per hectare when it is mature in 5 years time.  The plantation can be expected to give 70,000 tonnes of oil every year.  This is sufficient to drive more than 60,000 family cars for a whole year if converted into biodiesel.  

    Personal investments: private.finance@vepower.com
    Corporate investors: corporate.finance@vepower.com


  3. Biofuels and re-forestation, Indonesia:

    VEPOWER is partnering with a Malaysian concern to develop 25,000 hectares of land into a bioenergy plantation. 

    Local people will be offered the options to take up a plot of land for the cultivation of Jatropha curcas while co-cultivating food and cash crops.  Toward the end of the projected 40 year lifespan of the planting native forest trees will be planted among the Jatropha trees in an initiative to restore the native forests.  

    Personal investments: private.finance@vepower.com
    Corporate investors: corporate.finance@vepower.com
 
Take note:

VEPOWER has a broad range of investment opportunities:

  • Power plant, UK

  • Biofuel plantation, Ghana

  • Biofuels and re-forestation, Indonesia